MASTER PLAN 2005

Phase Two

                

            Select either picture for a larger view 

Phase two primarily attempts to increase the number of classrooms and multi-function rooms that could not be included into phase one.  This is to be accomplished by connecting a two story addition with numerous classrooms.  The detailed use of these classrooms will depend on the church's needs at the time and some may serve as multi function rooms.  These uses may include:

bullet

Adding rooms to increase the preschool space if needed.

bullet

Adding dedicated Sunday school rooms.

bullet

Adding classrooms for adult small groups and meetings.

bullet

Adding a choir room.

bullet

Adding a dedicated library.

bullet

Phase two also includes increasing the number of parking spaces along the north side of the lot and creating a separate drop off area for the preschool.

 